Six stages, three to six weeks
Transparent timelines at every stage of the process — so you know exactly when to expect your custom merchandise.
Typical timeline
Each row is the working window for that stage on a standard run.
| Stage | Duration | What happens | Express option |
|---|---|---|---|
| Consultation & quote | 1–2 days | ||
| Design & mockup | 3–7 days | ||
| Sampling | 7–14 days | ||
| Production | 2–4 weeks | ||
| Quality control | 2–4 days | ||
| Shipping | 5–15 business days |
What you order moves the date
Production weeks only — design, sampling and shipping sit on top.
Jackets & outerwear
3–4 weeksTechnical construction, seam sealing, multi-layer assembly
Snowboards
3–4 weeksCustom layup, pressing, base grinding, edge work
Goggles
2–3 weeksLens assembly, strap branding, frame color matching
Tees, hoodies & apparel
2–3 weeksScreen print, embroidery, or DTG. Faster for simpler orders
Caps & beanies
2–3 weeksEmbroidery, patch application, or puff print
Stickers & accessories
1–2 weeksQuick turnaround, digital or die-cut printing
Need it faster? Contact us about rush options — we'll check factory capacity and get back to you within 24 hours.
Four things that stretch a run
Design complexity
Multi-color prints, all-over sublimation, and complex embroidery take longer than simple single-color logos.
Order volume
Larger orders need more production time. We provide estimated timelines based on your specific quantity during quoting.
Material availability
Specialty fabrics, custom colors, and unique trims may need to be sourced or dyed to order, which can add 3–7 days.
Sample approval
The faster you approve your sample, the sooner production begins. Delays in feedback push the entire timeline back.
Lead time questions
How long does the entire production process take? +
A typical full production run takes 3–6 weeks end-to-end. This includes consultation (1–2 days), design and mockup (3–7 days), sampling (7–14 days), production (2–4 weeks), and shipping (5–15 business days). Rush options are available for urgent projects.
How long does design and sampling take? +
Design and mockup typically takes 3–7 days depending on complexity. Sampling takes 7–14 days including shipping the physical sample to you for approval. We can expedite sampling for an additional fee.
How long does production take? +
Production takes 2–4 weeks depending on product complexity and order volume. Simple items like t-shirts and caps are on the shorter end, while technical products like hardshell jackets and snowboards take longer due to specialized construction methods.
How long does international shipping take? +
International shipping takes 5–15 business days depending on destination and shipping method. We offer express options (3–7 business days) for an additional fee. See our shipping page for details.
Do you offer rush or expedited production? +
Yes. We can prioritize your order for an additional fee. Rush timelines depend on current factory capacity and product type. Contact us with your deadline and we'll let you know what's possible.
What factors can delay production? +
Delays can occur due to: design revision cycles, material availability, sample approval delays, complex customization requirements, and seasonal factory capacity. We communicate proactively about any potential delays and work to minimize them.
Deadline-driven?
Tell us your target date and we'll map out a production schedule that works backwards from it.
