Seven stages, each with a number attached
The same sequence runs every order, from a thirty-hoodie club kit to a full brand launch. The clock starts when the mockup is approved.
- 01 1–2 days
Consultation & briefing
Tell us the products, quantities, timeline and budget, and send any artwork or references. We recommend what fits the use case and return a quote with the numbers on it.
- 02 3–7 days
Design & mockup
Your artwork goes onto the actual product template in colour, with logo placement and sizing shown at production scale. Revisions happen here, where a change costs nothing.
- 03 7–14 days
Sampling & approval
A physical unit is produced and shipped for approval of look, feel and fit. Nothing enters production until it is signed off.
- 04 2–4 weeks
Manufacturing
Cutting, decoration and sewing. Simple items — tees, caps — sit at the short end; technical outerwear and snowboards at the long end.
- 05 in-line
Quality control
Four checkpoints: incoming materials, in-line monitoring during production, pre-shipment inspection, and a final check at packing. Defects are flagged and corrected before shipping.
- 06 quoted
Packaging & branding
Basic packaging is included. Premium branding and custom boxes are quoted per unit, so a gift order and a staff-uniform order do not carry the same packing cost.
- 07 5–15 business days
Shipping & delivery
Customs documentation, clearance and door-to-door delivery with tracking. Express runs 3–7 business days for an additional fee.
Three ways to start
The difference is who owns the design — not how much quality you get.
Start from a proven template. Pick colours, logo and packaging; we produce it. The fastest, lowest-investment path to a first run.
Bring your own specification, tech pack or sample. We manufacture to your exact spec with in-line quality control.
Our product with your label — a ready-made line without tooling a new one.
Process questions
What is the first step in the production process? +
A consultation where you share the product types, quantities, timeline and any design files. We recommend the products that fit and return a transparent quote.
How long does sampling and prototyping take? +
Sampling typically takes 7–14 days depending on product complexity, including shipping the physical sample for approval.
Do you provide design assistance? +
Yes. If you have an idea but no design files, the team can produce mockups and technical drawings, and guide colour selection, logo placement and materials.
What quality control measures do you have? +
Multi-point QC: raw material checks, in-line production monitoring, pre-shipment inspection, and final packaging verification. Defects are flagged and corrected before shipment.
Can I get samples before full production? +
Yes — pre-production samples are recommended to approve look, feel and fit. Sample costs are typically deducted from the final order.
How do you handle international shipping and customs? +
We manage customs documentation and clearance, then coordinate door-to-door shipping with full tracking.
What is the difference between ODM and OEM? +
ODM starts from our proven templates — you pick colours, logo and packaging. OEM means you bring the specification or sample and we manufacture to it. Private label puts your branding on a ready product. All three are available at low MOQs.
Start with the quantity.
One reply within 24 hours, Mon–Fri.
